Power plants projects

Buy a photovoltaic or wind power plant project
with the necessary permits

 

 

We prepare RES projects from finding and leasing a suitable land property (usually for a period of 25-29 years), through obtaining an environmental decision, building conditions and connection conditions, to preparation of a construction design and obtaining a building permit. The power plant project together with the necessary administrative documentation is a complete basis for the construction of such a facility.

We prepare projects from finding and leasing a suitable land property (usually for a period of 25-29 years), through obtaining an environmental decision, building conditions and connection conditions, to preparation of a construction design and obtaining a building permit. The power plant project together with the necessary administrative documentation is a complete basis for the construction of such a facility.

 

 

We have around 200 locations all over Poland at our disposal. We choose the place with our customers on the basis of, inter alia, information about the preferred capacity of the power plant, which determines the size of the plot for investment.

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.

Additional Cookies

This website uses the following additional cookies:

(List the cookies that you are using on the website here.)